Wind-Offshore Engineer Machine Head
GE Wind Energy / Maskiningenjörsjobb / Karlstad
Observera att sista ansökningsdag har passerat.
Visa alla maskiningenjörsjobb i Karlstad,
Hammarö,
Forshaga,
Grums,
Kil eller i
hela Sverige Visa alla jobb hos GE Wind Energy i Karlstad,
Halmstad,
Kalmar eller i
hela Sverige System Integration Engineer Machine Head
Role Summary/Purpose:
The machine head of a wind turbine comprises all necessary equipment to take the mechanical power from the rotor into the power generator, as well as housing the electrical equipment.
The machine head subsystem team is responsible for system integration for the complete nacelle.Interfaces: tower flange, rotor hub flange, transport and lifting.
Machine layout and technical design solutions on a System and subsystem level are included.
The team will cooperate with the different component owners in the Mechanical components Center of Excellence organization, who will produce detailed component engineering:documents, reports and drawings for production, certification etc .
This position focuses mainly on Mechanical drive. The mechanical drive mainly consists of Shaft, main bearings with lubrication system, coupling, rotor lock, parking brake and inching system.
For more information or apply for this job, please use following link:
http://www.ge.com/jobsearch/jobs/Offshore-Wind-System-Integration-Engineer-Mac hine-Head-(m*slash*f)/Engineering*slash*Technology/GE-Energy-Infrastructure/Sw eden/Karlstad?jobid=1121843&country=Sweden&pagenumber=1
Publiceringsdatum2010-07-19Arbetstider och omfattningTillsvidare
Heltid
ErsättningFast lön
Så ansöker duAnge följande referens när du ansöker: 1121843
Ansökan kan tyvärr inte göras via e-post.
KontaktSara Janglund, HR, 054-103632 (Telefon)
FöretagGE Wind Energy
AdressGE Wind Energy
Våxnäsgatan 10
65340 KARLSTAD
KontorsadressVåxnäsgatan 10
KontaktuppgifterTelefonnummer: 054-196482
Jobbnummer 697433
Observera att sista ansökningsdag har passerat.