Wind – Offshore Power Distribution
GE Wind Energy / Elkraftsjobb / Karlstad
2010-05-18
Observera att sista ansökningsdag har passerat.
➡️ Klicka här för den senare publicerade platsannonsen "Wind – Offshore Power Distribution" (publicerad 2010-07-19) ⬅️
Visa alla elkraftsjobb i Karlstad,
Hammarö,
Forshaga,
Grums,
Kil eller i
hela Sverige Visa alla jobb hos GE Wind Energy i Karlstad,
Halmstad,
Kalmar eller i
hela Sverige System Integration Leader Power Distribution
Role Summary/Purpose
The electrical subsystem team is responsible for system integration for the complete electrical power generation and distribution system for an offshore wind farm.The main interfaces to other subsystems are the turbine shaft, torque brackets, mechanical structures and grid connections.The electrical power line of a wind turbine comprises all necessary equipment to take the mechanical power from the turbine shaft into electrical power through generator and converter.
Esssential Responsibilities:
The System Integration Leader Power Distribution and Electrical Protection - Offshore Platform will have ownership and responsibility for the mechanical and electrical design solutions on a system and subsystem level for the transformer, switchgear, grid circuit breaker and the electrical protection.
For more information or Apply for this job please use following link:
http://www.ge.com/jobsearch/jobs/ystem-Integration-Leader-Power-Distribution-O ffshore-Wind/Engineering*slash*Technology/GE-Energy-Infrastructure/Sweden/Karl stad?jobid=1128861&country=Sweden&pagenumber=2
Publiceringsdatum2010-05-18Arbetstider och omfattningTillsvidare
Heltid
ErsättningFast lön
Så ansöker duAnge följande referens när du ansöker: 1128861
Ansökan kan tyvärr inte göras via e-post.
KontaktMikael Björk, 054-196485 (Phone)
FöretagGE Wind Energy
AdressGE Wind Energy
Våxnäsgatan 10
65340 KARLSTAD
KontorsadressVåxnäsgatan 10
Jobbnummer 653870
Observera att sista ansökningsdag har passerat.